26/3245 - Detailed engineering design for the New Vinstra Fire Station.
Description du marché
Nord-Fron municipality shall establish a new fire station at Vinstra. The draft/concept basis and the room and function programme are in place, with guidelines for logistics (printing), clean/unclean zones, as well as site and outdoor conditions. The aim of the procurement is to engage a multi-disciplinary consultant group for detailed engineering design services and the preparation of a complete tender documentation (NS 3420) for the procurement of contractors. The assignment includes engineering design management, BIM coordination and necessary support disciplines.
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Architecture, ingénierie & conseil technique en Norvège par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic