BME EEA 2024-14 - Project manager charging points
Description du marché
In the period 2025-2028 the Agency for Urban Environment (BME) shall establish a number of charging points for electric vehicles at different locations in Bergen and needs to strengthen the builder side in following-up this work. In the period 2025-2029 approx. NOK 25 million to various charging point measures. We are therefore looking for a person who has experience from following up engineering design services and construction contracts and who can be the builder ́s representative in these phases. The engagement is for two years with an option for an extension for 1+1 year.
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Architecture, ingénierie & conseil technique en Norvège par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic