CH – Umbau der Oberleitungsanlage Basel Bad Bf
Description du marché
The new overhead line system to be built must be of low-maintenance construction. Constraint points for the overhead line system are the position of the tracks to be covered and Switches, the existing overhead line system, the structures and the track spacing. Small track spacings require the use of steel profile masts and yoke structures require. The conversion or new construction of the overhead line system is carried out using standard components according to the Ebs Drawings in accordance with the valid regulations of DB AG (Ril 462, 997, 800) as well of EN 50119, 50122-1 and 50341-1. For the overhead line types The maximum permissible travel speeds are taken into account. The overhead line system for route 4000 will be built in the Re 200 design. In the train station the newly built system was built as Re 100. Chainworks to be converted remain in the The general design type is the Re 75.
Pouvoir adjudicateur
Recevoir les prochains marchés Construction & travaux publics en Allemagne par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic