Construction of M3 Cimislia Bypass, km 18+700-km 26+138
Description du marché
The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of minor intersections. Construction of retaining wall and underground drainage system (manholes), slope protection, bridges and overpasses constructions. Arrangement of drainage facilities as construction of the culverts, consolidated lined side drains and outside interception ditches. The pavement structure consists of construction of the embankment, base course, stabilized base, and new asphalt layers. Project include the arrangement of power lines of 10kV – 110kV, arrangement of underground communication cables, and arrangement of gas lines. Time for Works’ Completion is 30 months, and 24 months of the Defects Notification Period. The Applicable Guidelines is the Guide to Procurement for Projects financed by the EIB, version March 2024 (EIB GtP). Tenderers shall not have the option of submitting their tenders electronically. Tenderers may submit their Tenders (original and copies) by courier or by hand. In addition to the original of the Tender, the number of copies is: 1 (one) hard copy and one electronic copy of the tender on a memory stick or another media holder, Tenderers submitting Tenders by courier or by hand shall enclose the original and copies of the Tender in separate sealed envelopes. These envelopes shall then be enclosed in one single sealed package. All tenders must be accompanied by a tender security of EURO 1 200 000,00 (One million eight hundred thousand), or equivalent in local currency using an exchange rate as published by the National Bank of Moldova at the date of the security issuance. The tender validity period shall be: 120 (one hundred twenty) calendar days from the date of tender opening.
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Construction & travaux publics en MDA par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic