can-social
Énergie & combustibles
🇪🇺 TED
Engineering , Procurement & Installation of PV Parks Project
🌍 Grèce
Description du marché
Implementation Study, the revision or issuance or modification of all required permits for the connection of the PV to the System based on the current legislation, the Civil Engineering Works, the Supply – Transport – Installation – Commissioning and the operation and maintenance at the expense and responsibility of the Contractor until the approval of the Final Acceptance protocol of one (1) Photovoltaic Station with a nominal power of 94,926MWp in the location of the Municipalitiy of Farsala - Larissa.
Valeur estimée
47.7M EUR
Nature du contrat
Fournitures
Durée du contrat
12 mois
Lieu d'exécution
EL612
Lauréat
AKTOR GROUP-TERNA AE-NORTH SOLAR 1 JOINT-VENTURE
Pouvoir adjudicateur
Gratuit · Sans carte bancaire
Recevoir les prochains marchés Énergie & combustibles en Grèce par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic