F02 Pre-engineering, contract amendment
Description du marché
PROJECT OVERVIEW: The Factory 02 (F02) project involves the development of a facility on a 7.5-hectare site in the Nordics, with approximately 14,000 m² to be built in Phase 1. The site will be developed in two phases, each featuring six bioreactors. The full project cycle is estimated to take 47 months. OBJECTIVES AND STRUCTURE: The project follows a Front-End Loading (FEL) process to thoroughly understand the project and reduce changes during execution. This will take 12 months from January to December 2025, covering two key phases: alternative assessment and process design freeze, with the end goal of an advanced conceptual design package. SCOPE AND PROJECT DELIVERABLES: An advanced conceptual design package, cost estimate, and integrated project plans that cover permitting, engineering, procurement, and construction schedules.
Pouvoir adjudicateur
Recevoir les prochains marchés Architecture, ingénierie & conseil technique en Finlande par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic