P20899 Supply, install, commissioning, integration of Utility Meters for Dublin and Cork airport
Description du marché
daa is upgrading some of its electrical, thermal and water metering infrastructure across the Dublin Airport campus. The project covers the supply, installation, commissioning, integration of a new generation of utility meters, replacing legacy devices that no longer meet daa’s operational, accuracy or datamanagement requirements. The upgraded meters will provide highaccuracy, MIDcompliant measurement, enhanced data and realtime visibility of energy usage. The programme includes the deployment of new meters, communication interfaces, telemetry solutions for remote locations and full integration with Dublin airport’s existing Energy Management Systems. The solution must be open protocol and technology - agnostic. The project will also consider futureproofing options, including compatibility with LoRaWAN and other IoTbased technologies.
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Instruments de mesure en Irlande par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic