Manufacturing, Delivery, Installation and Commissioning Assistance of 110kV / 22kV & 10,5kV Power Transformers (Projects SGM & REB)
Description du marché
Lot 1: Project description for “Project Sustainable Growth Mitte (SGM)” Project objective is the installation of three electrical driven heat-only boiler at BEW’s site in Berlin Mitte to diversify sources of heat within Berlin’s district heating grid and to improve the green heat share till end of 2028. For this purpose, 3 parallel electrical driven boiler with a heat output of 40 MWth each shall be built. This announcement for Lot 1 considers the supply of two identical power transformers, each 125 MVA. • 2 identical power transformers with a performance of 125 MVA each, 110 kV / 22 kV with an On-load tap changer • delivery to HKW Mitte site ready to put on sliding system (rails) • switching group YNd5 • provide Lot (1) with Lot (3) Schedule (draft): Award of contract: March, 2025 Delivery to Berlin: Q1-2028
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Matériel électrique en Allemagne par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic