Appeldex.com
Award notice Matériel électrique 🇪🇺 TED

Mermaid & Seastar offshore windfarms - Supply and installation of submarine high voltage cables

🌍 Belgique
Publication
28/11/2018
Date limite
Valeur estimée
EUR
Donneur d'ordre
Otary RS

Description du marché

EPCI contract (Engineering, Procurement, Construction, Installation) for submarine high voltage cables (the connection facilities) and connection to the Belgian Modular Offshore Grid. The works may include future maintenance for a period to be further specified in the procurement documents. The domain concessions for operation of wind farms are attributed to Seastar NV and Mermaid THV respectively, who appoint Otary RS nv to conduct the present procurement procedure on their behalf and for their account. The final contracting entit(y)(ies) may be Otary RS NV and/or Seastar NV, Mermaid THV and/or any new or other company set up or participated in by, among others, any of the foregoing entities or a combination thereof. In the same sense the award procedure may, during its course, be continued by such contracting entit(y)(ies).

Procédure
Procédure négociée avec publication
Nature du contrat
Travaux
Lieu d'exécution
Belgique

Pouvoir adjudicateur

🏛 Otary RS

Secteur d'activité

Câble sous-marin

Lots (2)

1. Seastar offshore wind farm – Supply and installation of submarine high voltage cable
The contract encompasses the design, supply, offshore installation, testing and commissioning of approximately 6,5 km 225kV XLPE submarine high voltage cable and connection between the Seastar high voltage substation and the Belgian modular offshore grid. The Seastar offshore wind farm will have a capacity of approximately 246MW. The works may include future maintenance for a period to be further specified in the procurement documents
2. Mermaid offshore wind farm – Supply and installation of submarine high voltage cable
The contract accompassed the design, supply, offshore installation, testing and commissioning of approximately 18,5 km 225kV XLPE submarine high voltage cable and connection between the Mermaid high voltage substation and the Belgian modular offshore grid. The Mermaid offshore wind farm will have a capacity between 232-266MW. The works may include future maintenance for a period to be further specified in the procurement documents
Gratuit · Sans carte bancaire

Recevoir les prochains marchés Matériel électrique en Belgique par email

Alerte quotidienne · 7 000 nouveaux marchés/jour

Pas de spam · Désabonnement en 1 clic

Marchés similaires

Voir tous les AO similaires →

Questions fréquentes

Comment répondre à cet appel d'offres ?
Pour répondre à cet appel d'offres publié par Otary RS, commencez par consulter le cahier des charges complet via le lien vers la source officielle ci-dessus. Créez un compte gratuit sur Appeldex pour recevoir les futurs marchés Matériel électrique directement par email.
Qui peut répondre à ce marché Matériel électrique ?
Ce marché est ouvert à toute entreprise répondant aux critères techniques et financiers définis dans le cahier des charges. La date limite de dépôt des offres est le non précisée. Les PME peuvent répondre en groupement d'entreprises.
Comment trouver d'autres marchés Matériel électrique ?
Appeldex agrège plus de 236 000 appels d'offres publics en temps réel depuis TED (Journal officiel de l'UE), BOAMP (France), Find a Tender (Royaume-Uni), TenderNed (Pays-Bas) et d'autres sources officielles. Créez un compte gratuit pour configurer des alertes personnalisées sur les marchés Matériel électrique en Belgique.
Gratuit · Sans carte bancaire

Ne ratez plus aucun marché Matériel électrique

Alerte email quotidienne · 7 000 nouveaux marchés/jour · 27 pays EU

Pas de spam · Désabonnement en 1 clic

Recevoir les prochains marchés Matériel électrique par email
Gratuit · 7 000 nouveaux marchés indexés chaque jour
Créer un compte →