New competition for nitrogen purification installations, engineering design services
Description du marché
This procurement is for the delivery of consultancy and engineering design services for the establishment of nitrogen purification at the sewage treatment facility. The assignment includes the preparation of a detailed development plan for the entire sewage treatment facility, including the necessary plan processes and documentation. Furthermore, the tenderer shall carry out ground surveys and geotechnical assessments, as well as carry out detailed engineering design services for construction and other disciplines, except the dimensioning of pipes and reactors. All other calculations are included. The procurement includes i.a. the following services: - Detailed development/zoning plan for the entire site area. - Geotechnical surveys and assessments. - Recipient surveys and environmental assessments. - Complete the discharge application. - Detailed engineering design services for constructional engineering disciplines. - Multi-disciplinary engineering design services for all relevant technical disciplines. - Coordination and collaboration between disciplines throughout the engineering design phase. The tenderer shall ensure that the engineering design is carried out in accordance with the current laws, regulations, authority requirements and relevant standards. The procurement ́s value is estimated to: Above the EEA threshold value. The volume is an estimate and is not binding for the contracting authority. See the procurement documents for further information. The contracting authority reserves the right to cancel the competition, i.a. in connection with budgetary conditions. This procurement is considered to have an immaterial impact on climate and the environment, cf. the Regulations § 7-9, fifth paragraph. The justification for this is that the procurement is for consultancy services/consultancy services where the contracting authority has been cut off from affecting climate and environmental impact, as the requirements and criteria that are aimed at these elements will not have sufficient connection to the delivery, cf. DFØ's environmental supervisor. Apprentices: The contracting authority has assessed the procurement against the apprenticeship regulations, cf. the Procurement Act § 7 and concluded that there are no requirements for apprentices in this procurement, as the main elements of the contract do not include work where it is relevant to use labour with vocational certificates of apprenticeship or craft, subsidised that it is considered disproportionately, because there is a need for specialised competence that an apprentice cannot be expected to possess. Cf. the apprentice regulations §6 (3) and (4).
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Architecture, ingénierie & conseil technique en Norvège par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic