Appeldex.com
Contract notice Construction & travaux publics 🇪🇺 TED

RFT to Modify + Install Upgraded Air Extraction Duct Work on our Coating Line T+G Area at SmartPly Europe DAC ‘26

🌍 Irlande Fermé
Publication
19/05/2026
Date limite
2026-06-05
Valeur estimée
EUR
Donneur d'ordre

Description du marché

SMARTPLY Europe DAC is seeking suitably qualified engineering companies to modify and install an upgraded Air Extraction Duct system in the Coating Line and T+G (Tongue + Groove) area of the plant at our site in Belview Port, Slieverue, via Waterford (X91 PX75). This system is required to improve airflow in the ducts and provide separate Bag House connections for each production line. All ducting and final detailed drawings will be supplied by Scheuch GmbH (Free Issue to the Contractor). The Contractor is responsible for all installation, bracketry, lifting, safety documentation, and associated works as detailed below. It is envisaged that the works will take place during SmartPly’s Annual Shutdown: 24th August – 4th September 2026, with pre-shutdown works permitted in the weeks prior. Due to the nature of works as set out in this tender and other maintenance + construction activity being carried out on site, these have been deemed to be "CONSTRUCTION WORK" as per the HSA's Safety, Health and Welfare at Work (Construction) Regulations 2013. The successful Bidder will operate as "CONTRACTOR" and will be required to provide site-specific Risk Assessments, Method Statements, Training + Induction Records, Plant Certification, Lift Plans, and other requested information associated with the works. Client: SmartPly – Belview Port, Slieverue, via Waterford. Contact: Ciaran Brennan – 051 831 48 PSCS Successful Bidder Detailed Scope of Works The Contractor shall provide all labour, plant, lifting equipment, access platforms, bracketry, fixings and safety documentation necessary to complete the following works: Ducting Installation + Modification (Based on Drawing AT-03570328a) • Install and modify ducting as per Scheuch GmbH drawings (green = existing, black = new). • Remove existing ducting (Ø630mm) running from the Coating Line to Bag House 01 (BH01). • Replace with new reduced-size ducting (Ø400mm) running from the T+G Line to BH01. • Install new ducting (Ø630mm) running from the Coating Line to Bag House 04 (BH04), connecting into existing ducting (Ø710mm). • Remove the ducting line fitted under the existing Ø710mm line and blank off the opening. • Install new ducting of various diameters from the Splitter Saw to BH01, connecting into the lower extraction from the two Tenor machines and the QC Saw. Removal of Existing Ducting • Removal of existing ducting. Note: This shall be recorded in the RAMS for prior approval. Lifting Equipment + Access Platforms • The Contractor is responsible for all plant, lifting equipment, and access platforms (temporary, mobile, or fixed) required to carry out the works at heights of up to 19m above ground level. Start-Up Support + Commissioning • Provide start-up support. • Offer technical support for commissioning team. Handover Documentation The Contractor shall provide: • Site-specific Risk Assessments + Method Statements (RAMS) – to be issued 21 days prior to shutdown work commencing. • Lift plans and associated safety documentation. • Training + Induction Records. • Plant Certification. • As-installed documentation (if any variation from Scheuch drawings). Health + Safety Compliance The Contractor is responsible for all EHS requirements associated with the works, including but not limited to: • Complying with site rules and the safety + health plan. • Identifying hazards and eliminating or reducing risks. • Providing site-specific induction for all workers. • Appointing a safety officer where more than 20 persons are on site. • Reporting accidents to the Authority and to the PSCS where an employee cannot perform normal work for more than three days. All works must comply with: • Safety, Health and Welfare at Work Act 2005 • General Application Regulations 2007 • Construction Regulations 2013

Valeur estimée
90 000 EUR
Procédure
Appel d'offres ouvert
Nature du contrat
Travaux
Durée du contrat
1 mois
Lieu d'exécution
IE052

Pouvoir adjudicateur

🏛 SmartPly Europe DAC, Slieveure
Gratuit · Sans carte bancaire

Recevoir les prochains marchés Construction & travaux publics en Irlande par email

Alerte quotidienne · 7 000 nouveaux marchés/jour

Pas de spam · Désabonnement en 1 clic

Marchés similaires

Voir tous les AO similaires →

Questions fréquentes

Comment répondre à cet appel d'offres ?
Pour répondre à cet appel d'offres publié par cette autorité publique, commencez par consulter le cahier des charges complet via le lien vers la source officielle ci-dessus. Créez un compte gratuit sur Appeldex pour recevoir les futurs marchés Construction & travaux publics directement par email.
Qui peut répondre à ce marché Construction & travaux publics ?
Ce marché est ouvert à toute entreprise répondant aux critères techniques et financiers définis dans le cahier des charges. La date limite de dépôt des offres est le 2026-06-05. Les PME peuvent répondre en groupement d'entreprises.
Comment trouver d'autres marchés Construction & travaux publics ?
Appeldex agrège plus de 236 000 appels d'offres publics en temps réel depuis TED (Journal officiel de l'UE), BOAMP (France), Find a Tender (Royaume-Uni), TenderNed (Pays-Bas) et d'autres sources officielles. Créez un compte gratuit pour configurer des alertes personnalisées sur les marchés Construction & travaux publics en Irlande.
Gratuit · Sans carte bancaire

Ne ratez plus aucun marché Construction & travaux publics

Alerte email quotidienne · 7 000 nouveaux marchés/jour · 27 pays EU

Pas de spam · Désabonnement en 1 clic

Recevoir les prochains marchés Construction & travaux publics par email
Gratuit · 7 000 nouveaux marchés indexés chaque jour
Créer un compte →