Technical Water Treatment Plant
Description du marché
This contract notice apply to DIN Forsyning Teknisk Vand A/S cancellation of the procurement of Technical Water Treatment Plant. Technical Water Treatment Plant is a facility that cleans purified wastewater for use in Power-to-X facilities. The procurement comprised the complete delivery of a combined plant consisting of: Pure Water Treatment Plant; Reject Water Treatment Plant; buildings; and high voltage installations. The plant is called Technical Water Treatment Plant (TWTP). The TWTP will be located on Mådevej, 6700 Esbjerg. The project was divided in two phases; Phase 1 and Phase 2. Phase 2 is included as an option. The initial phase (Phase 1) will support approximately half of the total capacity.Project capacity: Phase 1 must have a capacity of 230 m³/h output Phase 2 (option) must have a capacity of 230 m³/h output The project including the optional Phase 2 must have a capacity of 460 m3/h output.
Pouvoir adjudicateur
Recevoir les prochains marchés Construction & travaux publics en Danemark par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic