Vestfjardarvegur (60) around Gufudalssveit, Bridges on Djupifjordur and Gufufjordur
Description du marché
The Icelandic Road and Coastal Administration (IRCA) opens tender for construction of two concrete bridges on Vestfjarðarvegur. Bridge on Djupifjodur is 58 m long and bridge on Gufufjordur is 130 m long. The tender includes demolition of the existing 119 m long temporary bridge on Gufufjordur along with transportation of filling material from current workplans and the construction of rock protection. The estimated main quantities are: Road construction: - Rock cutting 38.000 m3 - Filling 53.500 m3 - Rock protection 19.000 m3 Bridges - Bridge safety barrier 382 m - Excavation 17.300 m3 - Filling for concrete structures 6.000 m3 - Rock cutting 180 m3 - Formwork 5.900 m2 - Reinforcement steel 260 tonn - Post tension cables 58 tonn - Concrete 3120 m3 The project shall be completed in full on the 30th of September 2026.
Pouvoir adjudicateur
Comment répondre
Recevoir les prochains marchés Construction & travaux publics en ISL par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic