Walk to Work Accommodation Vessel Lot 1
Description du marché
Walk-to-Work vessels for accommodation and providing safe access to offshore installations and other works. The scope is divided into two (2) lots with one Walk-to-Work vessel in each lot. Lot 1 Estimated date of delivery between October 2026 and January 2027, with a duration (expected) end of December 2027. The contract can be extended (options) for up to a total of three and a half (3½) months at the Contracting Entity’s discretion. The scope of each lot comprises the supply of a Walk-to-Work Vessel each with the following provisions: • The Walk-to-Work accommodation vessel and its crew shall take on the responsibility to act as an integrated part of the construction and daily operation of the windfarm, including taking on tasks to assist the Contracting Entity and other personnel. • Dynamic positioning system of no less than DP2. • Offshore accommodation and catering for at least 80 of Contracting Entity’s personnel (PAX) in preferable single cabin configuration. Temporary living quarters (TLQ) are acceptable. • Storage area for six (6) ea. 20’ containers, parts, and equipment • Motion Compensated Gangway (MCG) for safe access to offshore substation at 20,3m (EVRF2007) and wind turbine external platform at 12,4m (EVRF2007). The gangway angel is not exceeding 10 degrees inclination. • 3D motion compensated crane for offshore lifting and able to lift to offshore substation at 20,3m (EVRF2007). • Boat landing • Helicopter deck • 24/7 operation and be capable of staying offshore for 28 days between port visits or supply runs.
Pouvoir adjudicateur
Recevoir les prochains marchés Transport routier & aérien en Pologne par email
Alerte quotidienne · 7 000 nouveaux marchés/jour
Pas de spam · Désabonnement en 1 clic