can-modif
🇪🇺 TED
250500-2026
RIELABORAZIONE E ADEGUAMENTO DEL PROGETTO PRELIMINARE INTEGRATO DEL PROLUNGAMENTO DELLA METROPOLITANA LINEA A OLTRE BATTISTINI - TRATTA BATTISTINI-TORREVECCHIA - AI FINI DELL’EMISSIONE DEL PFTE EX ART. 41 E ALL. I.7 DEL D.LGS. 36/2023 IN MODALITÀ BIM E CSP
🌍 IT
Marchés similaires
Prior notice
08/05/2026
COV - PIPELINE - Multi‑Disciplinary Design Team Framework 2027
GB
Contract notice
08/05/2026
Open Framework for Nuclear Technical Services
GB
J-66
Contract notice
08/05/2026
Aquatic plant survey and condition assessment of the Nene Washes ditch network and of 3 main channels/drains at the Nene and Ouse Washes Protected Sites, Cambridgeshire.
GB
Contract notice
08/05/2026
Geotechnical Works and and Associated Services
GB